The Works Underway At All Active Construction Sites

The Works Underway At All Active Construction Sites

The works are underway at all active construction sites within Belgrade Waterfront during the state of emergency. There are ongoing works for Kula Belgrade, Galerija Belgrade, residential buildings BW Magnolia, BW Arcadia, BW Aurora, BW Metropolitan, BW Terraces, BW Aria and BW Terra. At the same time, the construction works are underway for the extension of Woodrow Wilson Boulevard and Sava Promenada, for new streets within the development, as well as for the Sava Square reconstruction.

In parallel, there are ongoing preparations for the start of construction of several more residential buildings – the foundation works for BW Simfonija 1 and 2, BW Aqua and BW Verde will commence during the 2nd quarter.

All works are carried out in compliance with the health protection measures.

Belgrade Waterfront Sales Centres at 48 Karadjordjeva Street and at Sava Promenada are open to visitors on weekdays from 9 a.m. to 3 p.m. You can get additional information or schedule an appointment with our Sales Advisor by calling toll free number 0800 300 888 or by calling +381 11 7888 888 at any time. At the meeting, which will be held with respect to all health protection measures, you will get to know details about the current residential offer, construction progress and the amenities within the development. Also, if you register your interest at www.belgradewaterfront.com, our Sales Advisor will contact you shortly and acquaint you with Belgrade Waterfront’s offer.

You can watch the latest video showing the construction progress of Belgrade Waterfront buildings and infrastructure here.

Contact
Return To Top